Explore the Fuentes A-1
Architecture, from every perspective.
Fuentes A-1 / Exterior
The signature silhouette.
The A-1 imagined in its setting. Roof pitch, glazing, dormer and dimensions remain subject to comparison with approved drawings.
A coordinated multi-view showroom, not a rotatable 3D model. Accurate rotation and verified elevations require a manufacturer-approved model or dimensioned drawings.
Discuss this cabinConceptual rendering · Callout positions indicative
Anatomy of the A-1
01
Steel structure
Prefabricated bolted steel A-frame
Exceptional architecture. Remarkable value.
From approximately
$55,000.
Preliminary package described as cabin, foundation and professional installation. The written quotation confirms the foundation system, site suitability, installation coverage and final scope.
Manufactured in China. Approximately two months for international shipment is an estimate, not the full production-to-handover timeline. In-house assembly targets one week or less after site readiness, subject to location, permits, access and scope.
Request a project-specific quotation- 01
Site review & order
Review property, destination, approvals, scope and deposit terms.
- 02
Manufactured in China
Components manufactured and packed. Production duration to be confirmed.
- 03
International shipment
Approximately two months, owner estimate. Start/end milestones must be confirmed; not a total delivery promise.
- 04
Customs & inland delivery
Import clearance and site delivery depend on destination and access.
- 05
Site readiness
Complete permits, ground preparation, access and utilities before crew arrival.
- 06
In-house installation
Fuentes Frameworks crew. Target one week or less, subject to location, scope, conditions and readiness. Country-specific Central America coverage and inclusions to be confirmed in the written quotation.
- 07
Inspection & handover
Confirm inspection, commissioning and exterior utility responsibilities in the quotation.
What to budget beyond the preliminary package
- Delivery to site, priced by location
- Land; clearing, grading and leveling
- Access roads or driveways
- Well / septic and external utility connections
- HVAC, appliances and furniture unless quoted
- Permits, engineering and stamped drawings
- Destination-specific freight, duties and taxes; confirm logistics for both markets