Explore the Fuentes A-1

Architecture, from every perspective.

Colors & materials
Model
Fuentes A-1 · Studio Series
Approx. footprint
14 × 24 ft · 336 sq ft footprint (not certified living area)
Approx. front patio
14 × 10 ft
Capacity
Sleeps 2–4, subject to final layout and local approval
Layout
Bedroom below and sleeping loft above; full bathroom
Structure
Prefabricated bolted steel A-frame
Foundation
Helical / screw pile, preliminary. Engineering, soil suitability and written inclusion pending confirmation.
Envelope
Insulated walls, metal roofing, full-height glazed front and glass entry door
Flooring
SPC rigid-core flooring
Electrical
Wiring, panel, lights, switches and outlets in preliminary scope
Plumbing
Water supply and drains prepared for exterior hookups
Bathroom
Shower, toilet and vanity in preliminary scope

Fuentes A-1 / Specifications

The details behind the design.

Owner-supplied preliminary specifications. Approximate footprint is not certified habitable floor area. Final geometry, scope and local compliance require written confirmation.

A coordinated multi-view showroom, not a rotatable 3D model. Accurate rotation and verified elevations require a manufacturer-approved model or dimensioned drawings.

Discuss this cabin
Manufacturing, shipping & installation

Exceptional architecture. Remarkable value.

From approximately
$55,000.

Preliminary package described as cabin, foundation and professional installation. The written quotation confirms the foundation system, site suitability, installation coverage and final scope.

Manufactured in China. Approximately two months for international shipment is an estimate, not the full production-to-handover timeline. In-house assembly targets one week or less after site readiness, subject to location, permits, access and scope.

Request a project-specific quotation
  1. 01

    Site review & order

    Review property, destination, approvals, scope and deposit terms.

  2. 02

    Manufactured in China

    Components manufactured and packed. Production duration to be confirmed.

  3. 03

    International shipment

    Approximately two months, owner estimate. Start/end milestones must be confirmed; not a total delivery promise.

  4. 04

    Customs & inland delivery

    Import clearance and site delivery depend on destination and access.

  5. 05

    Site readiness

    Complete permits, ground preparation, access and utilities before crew arrival.

  6. 06

    In-house installation

    Fuentes Frameworks crew. Target one week or less, subject to location, scope, conditions and readiness. Country-specific Central America coverage and inclusions to be confirmed in the written quotation.

  7. 07

    Inspection & handover

    Confirm inspection, commissioning and exterior utility responsibilities in the quotation.

What to budget beyond the preliminary package
  • Delivery to site, priced by location
  • Land; clearing, grading and leveling
  • Access roads or driveways
  • Well / septic and external utility connections
  • HVAC, appliances and furniture unless quoted
  • Permits, engineering and stamped drawings
  • Destination-specific freight, duties and taxes; confirm logistics for both markets

Clear scope. Better planning.

Understanding Your Investment

≈ $55,000 USD

Preliminary Fuentes A-1 package, subject to written quotation. Not an all-inclusive turnkey project cost.

Request a Site-Specific Quote

The preliminary base package

Cabin, foundation and professional installation as described in the preliminary documents. Foundation suitability, installation coverage and every inclusion must be confirmed in the written quotation.

View documented cabin scope
Structure
Prefabricated bolted steel A-frame
Envelope
Insulated walls, metal roofing, full-height glazed front and glass entry door
Flooring
SPC rigid-core flooring
Electrical
Wiring, panel, lights, switches and outlets in preliminary scope
Plumbing
Water supply and drains prepared for exterior hookups
Bathroom
Shower, toilet and vanity in preliminary scope
Foundation
Helical / screw pile, preliminary. Engineering, soil suitability and written inclusion pending confirmation.

Budget separately

  • International and inland freight
  • Customs, destination-specific duties and taxes
  • Land, site preparation and access
  • External utility connections, well and septic
  • Permits and site-specific engineering
  • Furniture, appliances and HVAC unless quoted
  • Additional landscaping and amenities
  • Project contingencies